Ministry proposes building all future state offices outside Hanoi centre

According to a new draft of the Hanoi master plan submitted by the Ministry of Construction, future state offices would be built in My Dinh area.

According to a new draft of the Hanoi master plan submitted by the Ministry of Construction, future state offices would be built in My Dinh area.

Headquarters of ministries and agencies proposed at My Dinh area and western area of West Lake
Headquarters of ministries and agencies proposed at My Dinh area and western area of West Lake

The Ministry of Construction has submitted a new draft of the Hanoi master plan to Prime Minister Nguyen Tan Dung for approval.

Under the plan to 2030 with a vision until 2050, headquarters of the State Party, National Assembly, state and government agencies would be located to Ba Dinh District.

Headquarters and offices of the central-level agencies allowed to stay the inner city will be upgraded. Meanwhile those which have to be relocated outside the city’s centre will be moved and rebuilt in Me Tri-My Dinh in Tu Liem District or the western area of West Lake.

Headquarters of the the municipal People’s Committee and the party committee will be situated around Hoan Kiem (Sword) Lake.

International trade exhibition centres will be built at Me Tri area and Dong Anh District; international trade and finance centres will be set up in the West Lake area and banking and financial trade centres are planned at the urban areas of Ha Dong, Dan Phuong, Hoai Duc, Thuong Tin and Thanh Tri along Belt Road 4.

The ministry says in the new draft plan that the planning of an axis linking West Lake and Ba Vi District will be kept unchanged like in previous drafts. It means that urban infrastructure systems will be expanded with building new roads to connect satellite urban areas and central ones such as Tay Thang Long-Son Tay, Ha Dong-Xuan Mai, and Ngoc Hoi-Phu Xuyen roads, Thang Long Highway and National Highway 32.

Many belt roads will be upgraded, expanded and rebuilt. Underground parking lots should be built on 44-km Belt Road 2. Belt Road 3, 65km long, is designed to have 10-12 lanes, including four for high-speed vehicles.

Construction of roads on belt roads 3 and 5 will be sped up to form a major urban traffic route for the new urban areas of Me Linh-Dong Anh and Long Bien-Gia Lam.

Dan Tri

Tin cùng chuyên mục

Thủ tướng Chính phủ Phạm Minh Chính dự, chứng kiến Lễ ký, trao 26 thỏa thuận hợp tác của các bộ, ngành và doanh nghiệp Việt Nam và đối tác Anh.

Thủ tướng Phạm Minh Chính dự Hội nghị COP26 và làm việc tại Anh: Ký kết thỏa thuận hợp tác trị giá hàng tỷ USD

(PLVN) - Nhân chuyến tham dự Hội nghị COP26 và làm việc tại Vương quốc Anh, chiều 31/10 (giờ địa phương), tại thành phố Edinburg, Scotland, Thủ tướng Chính phủ Phạm Minh Chính đã dự, chứng kiến lễ ký, trao 26 thỏa thuận hợp tác trong các lĩnh vực thương mại, nông nghiệp, năng lượng, y tế, giáo dục, đào tạo, bảo vệ môi trường, thể thao... của các bộ, ngành và doanh nghiệp Việt Nam và đối tác Anh.

Đọc thêm

Giảm tải mật độ, hạn chế lây nhiễm trong khu cách ly

làm thủ tục tiếp nhận công dân vào khu cách ly tại Trường Quân sự Bộ Tư lệnh Thủ đô. Ảnh: báo Lao động (chụp tháng 2/2020)
(PLVN) - Những ngày vừa qua, số ca F1 chuyển biến thành F0 tăng nhanh nên TP Hà Nội đã chỉ đạo xét nghiệm toàn bộ số F1 đang cách ly để sàng lọc, rà soát mà không cần chờ đủ thời gian 7 ngày theo quy định. Qua xét nghiệm đã xác định thêm 27 ca bệnh chuyển từ F1 thành F0.

Những nữ Công an tỉnh Phú Thọ nhiệt huyết trong công việc

Chiến sỹ Cảnh sát nhập dữ liệu thông tin của người dân.
(PLVN) - Trong bất kể lĩnh vực công tác nào, thì những “bông hồng thép”- nữ cán bộ, chiến sĩ Phòng Cảnh sát quản lý hành chính về trật tự xã hội Công an Phú Thọ đều luôn nỗ lực phấn đấu hoàn thành tốt nhiệm vụ, góp phần mang lại cuộc sống bình yên, hạnh phúc cho nhân dân.